Skip to main content
Marion, Gas City & Upland

Manufactured Homes
in Marion & Grant County

Grant County splits permits three ways β€” Marion, the county's area plan commission, and Gas City β€” and its permit form has a section just for manufactured home set-up. Septic starts with a certified soil scientist, and the Mississinewa runs through Marion. Here is the order things happen in.

Why Grant County Buyers
Shop With Us

I-69 crosses the county, with US 35 and State Roads 9, 13, 18 and 5 reaching Marion and the towns, so most of a delivery is on through routes. We deliver across Indiana, with freight quoted per route β€” it is its own line on your quote, never folded into the home price.

  • βœ“A permit form with its own manufactured-home set-up section
  • βœ“Contractors registered with the area plan commission
  • βœ“Certified soil scientist first for any septic permit
  • βœ“Freight quoted per route as its own line

Communities we deliver to

  • Marion
  • Gas City
  • Jonesboro
  • Fairmount
  • Upland
  • Swayzee
  • Van Buren
  • Sweetser
  • Matthews
County seat
Marion
County and towns
Grant County Area Plan Commission
Inside Marion
City Planning, then Building
Septic
Grant County Health Dept.

Freight is quoted line by line for your exact site; site work and set-up are done by the contractors you hire. See what to expect on delivery day.

Zoning & permits in Grant County

The Grant County Area Plan Commission, on South Adams Street in Marion, covers the unincorporated county and the towns of Van Buren, Upland, Matthews, Jonesboro, Fairmount and Sweetser. Marion runs its own planning and building departments, and Gas City is outside the area plan commission's list. Ask first which office has your parcel.

Foundations & frost depth

Footings and piers go below the frost depth the county building department sets; ask for the figure when you apply for the permit. Champion's set-up drawing gives the pier layout, and the foundation contractor you hire builds to both, so plan the concrete before the home ships.

Read our zoning guide and site-work checklist for what a typical Grant County set-up involves.

A permit form written with manufactured homes in mind

The area plan commission's residential permit form has its own section for manufactured home set-up and asks for the foundation contractor's state licence. Nothing can be occupied until every inspection has passed and a certificate of occupancy is issued. Contractors working in the commission's jurisdiction must also register with it β€” registration moved online in 2024 β€” so ask your foundation, set-up and utility crews whether theirs is current.

Inside Marion the order is different: an Improvement Location Permit from the City Planning Department comes first, then the city's Building Department handles contractor registration, inspections and the certificate of occupancy.

Septic: soil scientist, installer, then the permit

A septic permit from the Grant County Health Department is required before a system is built, repaired or altered. The health department's own order is: hire an ARCPACS-certified soil scientist for the soil analysis (a partial list comes with the application), choose a county-registered installer, submit the application, then plan review, then the permit. Installers must hold IOWPA certification or pass the county's exam.

Size the system to the bedroom count of the plan you choose, and start the soil work as soon as you own the land.

The Mississinewa through Marion

The Mississinewa River runs through Marion. The U.S. Geological Survey has published flood-inundation maps for a nine-mile reach there, and the county's hazard mitigation plan maps the floodplain. The National Weather Service notes that most county roads near the river flood in a major flood β€” which matters for getting to the home, not only for the home itself. Check the flood maps for any parcel near the river before you buy.

Utilities

Indiana Michigan Power serves Marion, and Gas City runs its own municipal electric utility. In the countryside, ask the electric provider for your parcel what service to the building site will take, and confirm whether natural gas reaches it before you choose a furnace.

Who to call in Grant County

These offices set the rules and issue the permits. Check with them about your parcel before you buy land or order a home.

Grant County questions

Who issues the permit for a manufactured home in Grant County?

In the unincorporated county and six of its towns, the Grant County Area Plan Commission, whose permit form has a manufactured-home set-up section. Inside Marion, the city's Planning Department issues the location permit and its Building Department the rest.

Do my contractors need to register?

Yes, with the Grant County Area Plan Commission for work in its jurisdiction, and with the city in Marion. Ask each contractor before you hire them.

How does the septic permit work in Grant County?

Certified soil scientist first, then a county-registered installer, then the application, plan review and the permit β€” in that order, before any work begins.

Do you deliver to Marion and Gas City?

Yes. We deliver across Indiana, with freight quoted per route as its own line on your quote.

Factory Direct Homes Center is not a lender and does not offer, arrange or broker financing. The lender list names lenders our customers have used before β€” it is information, not a recommendation. We are not affiliated with any of them, we receive nothing for naming them, the order they appear in means nothing, and you may apply to as many as you like. The choice is yours.

Site work, foundations, utilities and setup are yours to arrange. Our contractor list names licensed and insured contractors past customers have used β€” it is information, not a recommendation or an endorsement. We do not hire, supervise, schedule or warrant them, we receive nothing for naming them, and you are free to use anyone you choose.

Get a line-item quote for
your Grant County site

Pick a floor plan, tell us where it is going, and we’ll price the home, its options and the freight on separate lines. Site work and set-up are yours to contract.